Penmann recently finalised a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system designed to satisfy demanding hygiene and production criteria. The project included the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High Care https://bookmarkpressure.com/story20578482/penmann-completes-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2