Penmann recently finalised a significant HVAC upgrade at Nutricia’s Liverpool-based production site, implementing a purpose-built ventilation and climate control system built to comply with demanding hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across civil, Medium Care (MC) and High Care (HC) areas. https://wisesocialsmedia.com/story6131141/penmann-completes-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2