Penmann has completed a significant HVAC upgrade at Nutricia’s Liverpool facility, supplying a purpose-built ventilation and climate control system built to comply with strict hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based https://express-page.com/story6092201/the-penmann-team-finalises-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-to-align-with-the-fsi-development-programme